25 mm. Novopan climate floor underfloor heating plate for 20 mm. snake

59% Off
€22.66 per ml
€54.84
You save: €32.18 per ml
Model: 3840-1742245
Weight: 17,5 kg
Availability: In stock In stock
ml

25 MM. – ZONE SIZE UP TO 32 M2

Novopan Klimagulv is a 25 mm floor chipboard with milled grooves for laying aluminum heat distribution plates and heating hoses. Klimagulv is a thorough and complete solution for installing water-based underfloor heating. Novopan Klimagulv is suitable for both novelty and renovation. Climate floor is delivered in easy-to-handle formats and has an effective tongue/groove system on all 4 edges, which makes it easy to carry out correct gluing. Climate floor can be laid on joists or floating, which forms a solid, strong base for most floor coverings such as e.g. parquet floors, linoleum, carpet etc.

Our floor chipboard is intended for 20 mm underfloor heating pipes and 20 mm heat distribution boards.
The floor chipboards have an effective laying dimension of 1820x620x25mm. - 1 plate covers an area of 1.12 m2
Remember to buy aluminum heat distribution plates and hoses.

Remember to read the installation instructions before installation. Here you will also find information on the consumption of hose plates etc. See the instructions here.

Read here how to mill turning tracks yourself.

Hints

  • Lay empty pipe ø 34 mm between 1st and 2nd floor - to - or outlet for heating hoses

  • Remember to insulate empty pipes

  • Heating hose - 20 mm with internal oxygen barrier

  • NOVOPAN recommends 5 layers of PEX-A or PE-RT hoses in 20 mm for Klimagulv. If Alu-pex is chosen, attention must be paid to very careful hose assembly, as the rigid Alupex can deform the Ohm shape of the heat distribution plates, which can cause a risk of creaking noises

  • The choice of heat distribution plate is coordinated with the chosen pipe dimension

  • All heating systems must be shunt controlled so that the surface temperature of the floor does not exceed 27º C

  • The shunt control also applies during the construction period, and if drying out building moisture

  • The underfloor heating is connected and must be in operation for 1-2 weeks, so supplied construction moisture is gone before installation of finished floor

  • Moisture content in joists - approx. 8% ± 2

  • In cases where solid beams/joists are used, and the moisture content exceeds 11% in joists and 13% in the joists, the floor chipboards should be glued to the joists

  • Check that the construction is protected against rising moisture

  • Remember the correct location of any moisture barrier

  • Use plenty of glue - approx. 3/4 l per 25 lbs.

  • Carefully wipe the traces of glue

  • All screws used must be partially threaded

  • Dimension of track: Width 23 mm, depth 21.2 mm

  • Consumption of aluminum heat distribution plates 2.5 pcs. per m2 approx. 70-80% of the floor area must be covered

  • Heating hose consumption - 3.7 lbm. per m2

  • Zone size 30-32 m2

  • Do not use the floor for work - no traffic on the floor during execution

  • Cover the floor with PE foil if the floor covering is not to be installed immediately

  • Never skip screw holes

  • Boards, lamellar parquet and parquet sticks must not be attempted to be attached to chipboard with staples or gun nails

 

For more information, please visit this product's webpage.

  • 32% Off
    €0.75 per 1m2
    €22.66 per roll
    €33.39
    You save:
    €0.36 per 1m2
    €10.73 per roll
  • 32% Off
    €15.42
    €22.66
    You save: €7.24
  • 40% Off
    €21.31 per ml
    €35.53
    You save: €14.22 per ml
  • 53% Off
    Price from
    €132.60
    €281.44
    You save: €148.84